Inflowinventorypremium2321mpt Patched

Under specific conditions, a user with standard transaction rights could force an inventory inflow transaction into a closed accounting period by manipulating the date_posted parameter during API calls. This led to:

It was a masterwork of low-level assembly code. The "2321" stood for the port bridge he was forcing open, and "MPT" was his own signature: Massive Parallel Tracking . It was designed to force the lightweight legacy software to act as a hyper-threaded database capable of overriding the bloated corporate ERP. inflowinventorypremium2321mpt patched

Pin It on Pinterest

Share This